Scope of Works:
Rodri Civil Constructions delivered the FRP concrete package across two stages, including:
• Cast in-situ deck works, edge beams and diaphragms
• Stitch pours to parapets
• Approach slabs and transition slabs
• Installation of cast-in items and bearing set-outs
• Possession works to facilitate critical structural pours
All works were undertaken in accordance with TfNSW specifications and QA requirements.
Key Challenges:
• Staged construction methodology requiring strict sequencing
• Possession-based works with limited timeframes
• Constrained residential access and traffic interface Outcomes:
• Delivered structural elements on programme across both stages
• Achieved high-quality finishes meeting TfNSW bridge standards