Wahroonga Bridge

Scope of Works:

Rodri Civil Constructions delivered the FRP concrete package across two stages, including:

• Cast in-situ deck works, edge beams and diaphragms

• Stitch pours to parapets

• Approach slabs and transition slabs

• Installation of cast-in items and bearing set-outs

• Possession works to facilitate critical structural pours

All works were undertaken in accordance with TfNSW specifications and QA requirements.

 

Key Challenges:

• Staged construction methodology requiring strict sequencing

• Possession-based works with limited timeframes

• Constrained residential access and traffic interface Outcomes:

• Delivered structural elements on programme across both stages

• Achieved high-quality finishes meeting TfNSW bridge standards

Project Description

ClientHaslin Constructions
LocationIlloura Ave, Wahroonga
SectorBridges / Major Roads Infrastructure