Client: Transgrid / Gongues Construction Pty Ltd
Location: Mannering Park, NSW
Sector: Power / Utilities
Scope of Works
- Transformer (TX) footings.
- Cable trench slabs and walls.
- Slabs on ground.
Key Challenges
- Stringent tolerances for equipment alignment and embedded conduits.
- Working around existing live services and earthing grids.
Outcomes
- Survey-controlled set-out with pre-pour hold points for embeds/bolts.
- Plinths & Hold Down Bolts installed to millimetre tolerances; no rework for equipment install.
- Full compliance with utility standards and inspection regimes.
