Scope of Works:
• Extension of existing stormwater culverts beneath Sydenham Station
• Construction of in-situ curved concrete walls
Key Challenges:
• Managing constant live stormwater flows
• Compressed program due to limited Sydney Water bypass window
• Night works within an operational rail corridor
Outcomes:
The culvert extension was completed on time within the allocated shutdown window, maintaining system integrity and ensuring uninterrupted stormwater functionality. The works highlight Rodri Civil’s capability in delivering complex structural concrete solutions under constrained rail and hydraulic conditions.