Scope of Works
• Reinforced concrete abutments.
• Cast in-situ bridge decks.
• Transition F Type Concrete barriers.
• Footpaths and approach slabs.
• Installation of precast concrete elements.
Key Challenges
• Construction within a live traffic environment along a major arterial corridor.
• Staged delivery to accommodate carriageway widening and interchange reconfiguration.
• Integration of structural works alongside shared pedestrian and cyclist infrastructure. Outcomes
• Maintained safe operations under complex traffic staging conditions.
• Achieved high-quality structural finishes in line with major road infrastructure standards.