Concord Substation

Location: Concord, NSW
Sector: Power / Utilities
Client / Head Contractor: Ausgrid / Gongues Construction Pty Ltd

Scope of Works

  • Transformer and switchroom foundations, fire-rated bund walls and slabs.
  • GIS/RTU equipment plinths, cable trenches and access slabs.
  • Oily-water drainage structures and bund lining interfaces.

 

Key Challenges

  • Stringent tolerances for equipment alignment and embedded conduits.
  • Working around existing live services and earthing grids.

 

Outcomes

  • Plinths delivered to millimetre tolerances; no rework for equipment install.
  • Full compliance with utility standards and inspection regimes.