Location: Rouse Hill, NSW
Sector: Rail
Client: Degnan Construction
Scope of Works:
- Full supply and installation of concrete slab package
- Detailed excavation works
- Structural and architectural blockwork Key Challenges:
- Strict noise and dust control requirements due to proximity to the Sydney Metro Operations Control Centre
Outcomes:
The project was completed on time and on budget, with stringent environmental controls successfully implemented to ensure uninterrupted operations at the adjacent control facility. Rodri Civil demonstrated disciplined project management within a high-security, high-sensitivity infrastructure environment.