Garlandtown (Moruya Bridge)

Scope of Works

• Reinforced concrete abutments.

• Cast in-situ bridge decks.

• Transition F Type Concrete barriers.

• Footpaths and approach slabs.

• Installation of precast concrete elements.

Key Challenges

• Construction within a live traffic environment along a major arterial corridor.

• Staged delivery to accommodate carriageway widening and interchange reconfiguration.

• Integration of structural works alongside shared pedestrian and cyclist infrastructure. Outcomes

• Maintained safe operations under complex traffic staging conditions.

• Achieved high-quality structural finishes in line with major road infrastructure standards.

Project Description

ClientSD Group
LocationMoruya, NSW
SectorBridges / Major Roads Infrastructure